Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Delivery Vans: Adjustable Type

Source:Automotive Piston Pin / Time:2026-09-18

Engine Starter System Specification Example for Delivery Vans: Adjustable Type

This is a worked specification for engine starter system in a adjustable type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The adjustable type version exists because the duty cycle on delivery vans is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationDelivery Vans
VersionAdjustable Type
Base materialChromed Steel
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishzinc plated
MOQ200 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • surface grinding
  • shot blasting
  • powder coating
  • robot welding
  • laser cutting
  • electroplating

Where this example applies

Programmes that run adjustable type most often specify this build for delivery vans. Related applications include dealership service, emergency vehicles, off-road bikes, light trucks, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top