Welcome to Auto, Motorcycle Parts & Accessories official website!

Transmission Fluid Pan Specification Example for Light Trucks: Drilled and Slotted

Source:12V Electric Car Fridge / Time:2026-09-18

Transmission Fluid Pan Specification Example for Light Trucks: Drilled and Slotted

This is a worked specification for transmission fluid pan in a drilled and slotted programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The drilled and slotted version exists because the duty cycle on light trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Transmission Fluid Pan

Example specification

ItemTransmission Fluid Pan
ApplicationLight Trucks
VersionDrilled and Slotted
Base materialCarbon Fibre Composite
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Fibre Composite, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Transmission Fluid Pan example

Processes involved

  • electroplating
  • injection moulding
  • sintering
  • ultrasonic cleaning
  • powder coating
  • laser cutting

Where this example applies

Programmes that run drilled and slotted most often specify this build for light trucks. Related applications include long-haul trucks, municipal fleets, light trucks, delivery vans, dealership service.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What is the minimum order quantity?

The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top