Welcome to Auto, Motorcycle Parts & Accessories official website!

MagneRide Suspension Specification Example for Long-Haul Trucks: High Performance

Source:Off-The-Road (OTR) Tires / Time:2026-09-18

MagneRide Suspension Specification Example for Long-Haul Trucks: High Performance

This is a worked specification for magneride suspension in a high performance programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The high performance version exists because the duty cycle on long-haul trucks is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

MagneRide Suspension

Example specification

ItemMagneRide Suspension
ApplicationLong-Haul Trucks
VersionHigh Performance
Base materialNatural Rubber
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishpowder coated
MOQ1,000 pieces per specification
Sampling10 working days, 3 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Natural Rubber, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

MagneRide Suspension example

Processes involved

  • die casting
  • laser cutting
  • anodising
  • gravity casting
  • CNC machining
  • cold forging

Where this example applies

Programmes that run high performance most often specify this build for long-haul trucks. Related applications include trailer axles, camper conversions, export programmes, city buses, emergency vehicles.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top