Welcome to Auto, Motorcycle Parts & Accessories official website!

Custom Vehicle Grille Specification Example for Construction Equipment: Racing Spec

Source:Mixed Service Tire / Time:2026-09-18

Custom Vehicle Grille Specification Example for Construction Equipment: Racing Spec

This is a worked specification for custom vehicle grille in a racing spec programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The racing spec version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Custom Vehicle Grille

Example specification

ItemCustom Vehicle Grille
ApplicationConstruction Equipment
VersionRacing Spec
Base materialPowder Coated Steel
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishpowder coated
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Powder Coated Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Custom Vehicle Grille example

Processes involved

  • shot blasting
  • cold forging
  • rubber vulcanisation
  • precision stamping
  • surface grinding
  • ultrasonic cleaning

Where this example applies

Programmes that run racing spec most often specify this build for construction equipment. Related applications include export programmes, delivery vans, dealership service, assembly programmes, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top