Welcome to Auto, Motorcycle Parts & Accessories official website!

Motorcycle Tail Light Specification Example for Rental Motorcycles: All-Weather Version

Source:Integrated Bumper / Time:2026-09-18

Motorcycle Tail Light Specification Example for Rental Motorcycles: All-Weather Version

This is a worked specification for motorcycle tail light in a all-weather version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The all-weather version version exists because the duty cycle on rental motorcycles is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Motorcycle Tail Light

Example specification

ItemMotorcycle Tail Light
ApplicationRental Motorcycles
VersionAll-Weather Version
Base materialChromed Steel
Controlled dimensions5 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishanodised
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceSAE J431

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Chromed Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Motorcycle Tail Light example

Processes involved

  • CNC machining
  • powder coating
  • ultrasonic cleaning
  • assembly line testing
  • sintering
  • robot welding

Where this example applies

Programmes that run all-weather version most often specify this build for rental motorcycles. Related applications include scooter fleets, aftermarket retail, rental motorcycles, passenger cars, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

Share a sample or a drawing and we will quote against a written specification, not against a photograph.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top