MagneRide Suspension Specification Example for Camper Conversions: Touring Version
MagneRide Suspension Specification Example for Camper Conversions: Touring Version
This is a worked specification for magneride suspension in a touring version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The touring version version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Example specification
| Item | MagneRide Suspension |
|---|---|
| Application | Camper Conversions |
| Version | Touring Version |
| Base material | PU Leather |
| Controlled dimensions | 4 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | anodised |
| MOQ | 3,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | IATF 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — PU Leather, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- rubber vulcanisation
- ultrasonic cleaning
- robot welding
- cold forging
- laser cutting
Where this example applies
Programmes that run touring version most often specify this build for camper conversions. Related applications include three-wheelers, light trucks, city buses, passenger cars, camper conversions.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Send the specification you are working to and we will confirm what we can match, what we would change and why.



