Motorcycle Tire Vector Specification Example for Passenger Cars: Vented Design
Motorcycle Tire Vector Specification Example for Passenger Cars: Vented Design
This is a worked specification for motorcycle tire vector in a vented design programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The vented design version exists because the duty cycle on passenger cars is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Motorcycle Tire Vector |
|---|---|
| Application | Passenger Cars |
| Version | Vented Design |
| Base material | Magnesium Alloy |
| Controlled dimensions | 5 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | as machined |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ISO 9001 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Magnesium Alloy, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- CNC machining
- surface grinding
- laser cutting
- assembly line testing
- ultrasonic cleaning
- robot welding
Where this example applies
Programmes that run vented design most often specify this build for passenger cars. Related applications include long-haul trucks, export programmes, racing teams, city buses, municipal fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



