Case Study: Fuel Pump Supply for a fleet operator in North Africa
Source:Case /
Time:2026-09-18
Fuel Pump for A fleet operator in North Africa
A fleet operator came to us with a fuel pump programme for North Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- A supplier who changed material without saying so
- Inconsistent hardness between lots
- Premature wear on the first batch

What was specified
| Part | Fuel Pump |
|---|---|
| Client | A fleet operator |
| Market | North Africa |
| Volume | 50,000 pieces across 6 specifications |
| Base material | Sintered Metal |
| Sampling rounds | 4 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | IATF 16949 |
How it was resolved
- The specification was rebuilt around Sintered Metal and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 50,000 pieces delivered inside the 4-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



