Case Study: Wheel Hub Assembly Supply for an agricultural cooperative in North Africa
Source:Case /
Time:2026-09-18
Wheel Hub Assembly for An agricultural cooperative in North Africa
An agricultural cooperative came to us with a wheel hub assembly programme for North Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Lead time that slipped twice before bulk started
- Packing that arrived crushed at the port
- A supplier who changed material without saying so

What was specified
| Part | Wheel Hub Assembly |
|---|---|
| Client | An agricultural cooperative |
| Market | North Africa |
| Volume | 10,000 pieces across 4 specifications |
| Base material | Neoprene |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | SGS |
How it was resolved
- The specification was rebuilt around Neoprene and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 8-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



