A bus operator came to us with a roof rack programme for Southeast Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • A supplier who changed material without saying so
  • Inconsistent hardness between lots
  • Premature wear on the first batch

Roof Rack case study

What was specified

PartRoof Rack
ClientA bus operator
MarketSoutheast Asia
Volume2,000 pieces across 3 specifications
Base materialMagnesium Alloy
Sampling rounds3
Delivery window10 weeks from PO to ex-factory
ComplianceE-mark

How it was resolved

  1. The specification was rebuilt around Magnesium Alloy and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Roof Rack production run

Result

  • 2,000 pieces delivered inside the 10-week window.
  • Unit cost held within 4.5% of the original quotation.
  • Inspection-related rejection stayed under 1.0%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top