Case Study: Steering Column Supply for a rental company in Europe
Source:Case /
Time:2026-09-18
Steering Column for A rental company in Europe
A rental company came to us with a steering column programme for Europe. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Lead time that slipped twice before bulk started
- A supplier who changed material without saying so
- A specification nobody had written down

What was specified
| Part | Steering Column |
|---|---|
| Client | A rental company |
| Market | Europe |
| Volume | 5,000 pieces across 4 specifications |
| Base material | PVC Coated Fabric |
| Sampling rounds | 3 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | IATF 16949 |
How it was resolved
- The specification was rebuilt around PVC Coated Fabric and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 5,000 pieces delivered inside the 4-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the specification you are working to and we will confirm what we can match, what we would change and why.