Case Study: Cabin Blower Supply for a mining contractor in Central America
Source:Case /
Time:2026-09-18
Cabin Blower for A mining contractor in Central America
A mining contractor came to us with a cabin blower programme for Central America. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Lead time that slipped twice before bulk started
- A specification nobody had written down
- Premature wear on the first batch

What was specified
| Part | Cabin Blower |
|---|---|
| Client | A mining contractor |
| Market | Central America |
| Volume | 5,000 pieces across 6 specifications |
| Base material | Zinc Plated Steel |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | IATF 16949 |
How it was resolved
- The specification was rebuilt around Zinc Plated Steel and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 5,000 pieces delivered inside the 10-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.