Case Study: Cylinder Head Supply for a workshop chain in Central America
Source:Case /
Time:2026-09-18
Cylinder Head for A workshop chain in Central America
A workshop chain came to us with a cylinder head programme for Central America. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Reorders that did not match the approved sample
- A specification nobody had written down
- Documentation that arrived after the container shipped

What was specified
| Part | Cylinder Head |
|---|---|
| Client | A workshop chain |
| Market | Central America |
| Volume | 5,000 pieces across 2 specifications |
| Base material | Brass |
| Sampling rounds | 4 |
| Delivery window | 8 weeks from PO to ex-factory |
| Compliance | TUV |
How it was resolved
- The specification was rebuilt around Brass and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 5,000 pieces delivered inside the 8-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the specification you are working to and we will confirm what we can match, what we would change and why.