Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Trailing Arm Supply for a rental company in Europe

Source:Case / Time:2026-09-18

Trailing Arm for A rental company in Europe

A rental company came to us with a trailing arm programme for Europe. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Warranty claims traced back to a single lot
  • Packing that arrived crushed at the port
  • A specification nobody had written down

Trailing Arm case study

What was specified

PartTrailing Arm
ClientA rental company
MarketEurope
Volume20,000 pieces across 2 specifications
Base materialNylon 66
Sampling rounds3
Delivery window8 weeks from PO to ex-factory
ComplianceECE R90

How it was resolved

  1. The specification was rebuilt around Nylon 66 and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Trailing Arm production run

Result

  • 20,000 pieces delivered inside the 8-week window.
  • Unit cost held within 2.0% of the original quotation.
  • Inspection-related rejection stayed under 1.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top