Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Thermostat Supply for a taxi fleet in the Caribbean

Source:Case / Time:2026-09-18

Thermostat for A taxi fleet in the Caribbean

A taxi fleet came to us with a thermostat programme for the Caribbean. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Inconsistent hardness between lots
  • A fitment that looked right on paper and failed on the bench
  • Premature wear on the first batch

Thermostat case study

What was specified

PartThermostat
ClientA taxi fleet
Marketthe Caribbean
Volume50,000 pieces across 2 specifications
Base materialTempered Glass
Sampling rounds3
Delivery window10 weeks from PO to ex-factory
ComplianceTUV

How it was resolved

  1. The specification was rebuilt around Tempered Glass and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Thermostat production run

Result

  • 50,000 pieces delivered inside the 10-week window.
  • Unit cost held within 2.0% of the original quotation.
  • Inspection-related rejection stayed under 2.0%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top