Case Study: Air Duct Supply for a national parts importer in West Africa
Air Duct for A national parts importer in West Africa
A national parts importer came to us with a air duct programme for West Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Premature wear on the first batch
- A fitment that looked right on paper and failed on the bench
- Warranty claims traced back to a single lot

What was specified
| Part | Air Duct |
|---|---|
| Client | A national parts importer |
| Market | West Africa |
| Volume | 50,000 pieces across 6 specifications |
| Base material | Anodised Aluminium |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | SGS |
How it was resolved
- The specification was rebuilt around Anodised Aluminium and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 50,000 pieces delivered inside the 6-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.
Planning something similar?
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



