Case Study: CV Joint Supply for a regional distributor in Oceania

Source:Case / Time:2026-09-18

CV Joint for A regional distributor in Oceania

A regional distributor came to us with a cv joint programme for Oceania. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Premature wear on the first batch
  • Inconsistent hardness between lots
  • Packing that arrived crushed at the port

CV Joint case study

What was specified

PartCV Joint
ClientA regional distributor
MarketOceania
Volume5,000 pieces across 2 specifications
Base materialZinc Plated Steel
Sampling rounds3
Delivery window10 weeks from PO to ex-factory
ComplianceSGS

How it was resolved

  1. The specification was rebuilt around Zinc Plated Steel and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

CV Joint production run

Result

  • 5,000 pieces delivered inside the 10-week window.
  • Unit cost held within 3.0% of the original quotation.
  • Inspection-related rejection stayed under 0.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top