Case Study: Glow Plug Supply for a courier company in Southeast Asia
Source:Case /
Time:2026-09-18
Glow Plug for A courier company in Southeast Asia
A courier company came to us with a glow plug programme for Southeast Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Premature wear on the first batch
- Packing that arrived crushed at the port
- A fitment that looked right on paper and failed on the bench

What was specified
| Part | Glow Plug |
|---|---|
| Client | A courier company |
| Market | Southeast Asia |
| Volume | 10,000 pieces across 6 specifications |
| Base material | High Density Foam |
| Sampling rounds | 3 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | E-mark |
How it was resolved
- The specification was rebuilt around High Density Foam and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 5-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.