Case Study: MAP Sensor Supply for a fleet operator in North America
Source:Case /
Time:2026-09-18
MAP Sensor for A fleet operator in North America
A fleet operator came to us with a map sensor programme for North America. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Packing that arrived crushed at the port
- Warranty claims traced back to a single lot
- Lead time that slipped twice before bulk started

What was specified
| Part | MAP Sensor |
|---|---|
| Client | A fleet operator |
| Market | North America |
| Volume | 20,000 pieces across 6 specifications |
| Base material | Nylon 66 |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | ECE R90 |
How it was resolved
- The specification was rebuilt around Nylon 66 and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 20,000 pieces delivered inside the 10-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



