Case Study: Suspension Bushing Supply for a supermarket chain in Oceania
Source:Case /
Time:2026-09-18
Suspension Bushing for A supermarket chain in Oceania
A supermarket chain came to us with a suspension bushing programme for Oceania. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Reorders that did not match the approved sample
- Inconsistent hardness between lots
- Premature wear on the first batch

What was specified
| Part | Suspension Bushing |
|---|---|
| Client | A supermarket chain |
| Market | Oceania |
| Volume | 10,000 pieces across 4 specifications |
| Base material | Aluminium Alloy |
| Sampling rounds | 2 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | DOT |
How it was resolved
- The specification was rebuilt around Aluminium Alloy and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 4-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 1.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Tell us the model, the fitment and the quantity and we will hold a production slot for you.



