Case Study: Tail Light Supply for a delivery platform in the Caribbean
Source:Case /
Time:2026-09-18
Tail Light for A delivery platform in the Caribbean
A delivery platform came to us with a tail light programme for the Caribbean. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- A fitment that looked right on paper and failed on the bench
- Reorders that did not match the approved sample
- Warranty claims traced back to a single lot

What was specified
| Part | Tail Light |
|---|---|
| Client | A delivery platform |
| Market | the Caribbean |
| Volume | 50,000 pieces across 6 specifications |
| Base material | Kevlar Composite |
| Sampling rounds | 3 |
| Delivery window | 4 weeks from PO to ex-factory |
| Compliance | ISO 9001 |
How it was resolved
- The specification was rebuilt around Kevlar Composite and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 50,000 pieces delivered inside the 4-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



