Case Study: Radiator Cap Supply for a courier company in Central America
Source:Case /
Time:2026-09-18
Radiator Cap for A courier company in Central America
A courier company came to us with a radiator cap programme for Central America. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Reorders that did not match the approved sample
- Premature wear on the first batch
- A supplier who changed material without saying so

What was specified
| Part | Radiator Cap |
|---|---|
| Client | A courier company |
| Market | Central America |
| Volume | 5,000 pieces across 3 specifications |
| Base material | Neoprene |
| Sampling rounds | 3 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | REACH |
How it was resolved
- The specification was rebuilt around Neoprene and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 5,000 pieces delivered inside the 10-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.
Planning something similar?
Share a sample or a drawing and we will quote against a written specification, not against a photograph.



