Case Study: Thermostat Supply for a dealership group in Southeast Asia
Source:Case /
Time:2026-09-18
Thermostat for A dealership group in Southeast Asia
A dealership group came to us with a thermostat programme for Southeast Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- A fitment that looked right on paper and failed on the bench
- Premature wear on the first batch
- Warranty claims traced back to a single lot

What was specified
| Part | Thermostat |
|---|---|
| Client | A dealership group |
| Market | Southeast Asia |
| Volume | 2,000 pieces across 4 specifications |
| Base material | Titanium Alloy |
| Sampling rounds | 2 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | ISO 9001 |
How it was resolved
- The specification was rebuilt around Titanium Alloy and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 2,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Ask for the current catalogue and the specification sheet for this line.



