Case Study: Washer Pump Supply for a bus operator in Central Asia
Source:Case /
Time:2026-09-18
Washer Pump for A bus operator in Central Asia
A bus operator came to us with a washer pump programme for Central Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Premature wear on the first batch
- Warranty claims traced back to a single lot
- A fitment that looked right on paper and failed on the bench

What was specified
| Part | Washer Pump |
|---|---|
| Client | A bus operator |
| Market | Central Asia |
| Volume | 10,000 pieces across 3 specifications |
| Base material | Carbon Steel |
| Sampling rounds | 4 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | SAE J431 |
How it was resolved
- The specification was rebuilt around Carbon Steel and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 10-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.