Case Study: Washer Pump Supply for a national parts importer in South Asia
Source:Case /
Time:2026-09-18
Washer Pump for A national parts importer in South Asia
A national parts importer came to us with a washer pump programme for South Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Warranty claims traced back to a single lot
- Packing that arrived crushed at the port
- A supplier who changed material without saying so

What was specified
| Part | Washer Pump |
|---|---|
| Client | A national parts importer |
| Market | South Asia |
| Volume | 2,000 pieces across 6 specifications |
| Base material | EPDM Rubber |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | ISO/TS 16949 |
How it was resolved
- The specification was rebuilt around EPDM Rubber and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 2,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.
Planning something similar?
Send the specification you are working to and we will confirm what we can match, what we would change and why.