Blower Motor for A mining contractor in Europe

A mining contractor came to us with a blower motor programme for Europe. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Premature wear on the first batch
  • A fitment that looked right on paper and failed on the bench
  • Reorders that did not match the approved sample

Blower Motor case study

What was specified

PartBlower Motor
ClientA mining contractor
MarketEurope
Volume10,000 pieces across 3 specifications
Base materialNylon 66
Sampling rounds3
Delivery window6 weeks from PO to ex-factory
ComplianceTUV

How it was resolved

  1. The specification was rebuilt around Nylon 66 and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Blower Motor production run

Result

  • 10,000 pieces delivered inside the 6-week window.
  • Unit cost held within 3.0% of the original quotation.
  • Inspection-related rejection stayed under 1.0%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top