A fleet operator came to us with a shift cable programme for West Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Premature wear on the first batch
  • Documentation that arrived after the container shipped
  • Reorders that did not match the approved sample

Shift Cable case study

What was specified

PartShift Cable
ClientA fleet operator
MarketWest Africa
Volume20,000 pieces across 6 specifications
Base materialEPDM Rubber
Sampling rounds3
Delivery window4 weeks from PO to ex-factory
ComplianceSAE J431

How it was resolved

  1. The specification was rebuilt around EPDM Rubber and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Shift Cable production run

Result

  • 20,000 pieces delivered inside the 4-week window.
  • Unit cost held within 4.5% of the original quotation.
  • Inspection-related rejection stayed under 1.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top