Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Flywheel Supply for a courier company in Oceania

Source:Case / Time:2026-09-18

Flywheel for A courier company in Oceania

A courier company came to us with a flywheel programme for Oceania. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Reorders that did not match the approved sample
  • Inconsistent hardness between lots
  • A specification nobody had written down

Flywheel case study

What was specified

PartFlywheel
ClientA courier company
MarketOceania
Volume2,000 pieces across 6 specifications
Base materialCast Iron
Sampling rounds4
Delivery window10 weeks from PO to ex-factory
ComplianceE-mark

How it was resolved

  1. The specification was rebuilt around Cast Iron and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Flywheel production run

Result

  • 2,000 pieces delivered inside the 10-week window.
  • Unit cost held within 2.0% of the original quotation.
  • Inspection-related rejection stayed under 1.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top