Case Study: Parking Sensor Supply for a delivery platform in West Africa
Source:Case /
Time:2026-09-18
Parking Sensor for A delivery platform in West Africa
A delivery platform came to us with a parking sensor programme for West Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Inconsistent hardness between lots
- Lead time that slipped twice before bulk started
- Reorders that did not match the approved sample

What was specified
| Part | Parking Sensor |
|---|---|
| Client | A delivery platform |
| Market | West Africa |
| Volume | 2,000 pieces across 3 specifications |
| Base material | High Density Foam |
| Sampling rounds | 2 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | E-mark |
How it was resolved
- The specification was rebuilt around High Density Foam and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 2,000 pieces delivered inside the 5-week window.
- Unit cost held within 1.5% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Share a sample or a drawing and we will quote against a written specification, not against a photograph.