Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Air Box Supply for a national parts importer in Central Asia

Source:Case / Time:2026-09-18

Air Box for A national parts importer in Central Asia

A national parts importer came to us with a air box programme for Central Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Warranty claims traced back to a single lot
  • Premature wear on the first batch
  • Inconsistent hardness between lots

Air Box case study

What was specified

PartAir Box
ClientA national parts importer
MarketCentral Asia
Volume10,000 pieces across 6 specifications
Base materialReinforced Nylon
Sampling rounds2
Delivery window8 weeks from PO to ex-factory
ComplianceREACH

How it was resolved

  1. The specification was rebuilt around Reinforced Nylon and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Air Box production run

Result

  • 10,000 pieces delivered inside the 8-week window.
  • Unit cost held within 1.5% of the original quotation.
  • Inspection-related rejection stayed under 1.0%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top