Case Study: Headlight Assembly Supply for a delivery platform in West Africa
Source:Case /
Time:2026-09-18
Headlight Assembly for A delivery platform in West Africa
A delivery platform came to us with a headlight assembly programme for West Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Warranty claims traced back to a single lot
- Lead time that slipped twice before bulk started
- Packing that arrived crushed at the port

What was specified
| Part | Headlight Assembly |
|---|---|
| Client | A delivery platform |
| Market | West Africa |
| Volume | 10,000 pieces across 3 specifications |
| Base material | Ceramic Composite |
| Sampling rounds | 2 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | REACH |
How it was resolved
- The specification was rebuilt around Ceramic Composite and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 10-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.