Case Study: Lug Nut Supply for a logistics company in South Asia

Source:Case / Time:2026-09-18

Lug Nut for A logistics company in South Asia

A logistics company came to us with a lug nut programme for South Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Premature wear on the first batch
  • Lead time that slipped twice before bulk started
  • A specification nobody had written down

Lug Nut case study

What was specified

PartLug Nut
ClientA logistics company
MarketSouth Asia
Volume5,000 pieces across 3 specifications
Base materialReinforced Nylon
Sampling rounds2
Delivery window5 weeks from PO to ex-factory
ComplianceTUV

How it was resolved

  1. The specification was rebuilt around Reinforced Nylon and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Lug Nut production run

Result

  • 5,000 pieces delivered inside the 5-week window.
  • Unit cost held within 4.5% of the original quotation.
  • Inspection-related rejection stayed under 0.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Lock the material standard before sampling. Once the base changes, every downstream approval has to be redone and the calendar slips.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.