Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Gasket Set Supply for a rental company in North Africa

Source:Case / Time:2026-09-18

Gasket Set for A rental company in North Africa

A rental company came to us with a gasket set programme for North Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • Documentation that arrived after the container shipped
  • A fitment that looked right on paper and failed on the bench
  • Packing that arrived crushed at the port

Gasket Set case study

What was specified

PartGasket Set
ClientA rental company
MarketNorth Africa
Volume50,000 pieces across 2 specifications
Base materialNylon 66
Sampling rounds2
Delivery window8 weeks from PO to ex-factory
ComplianceREACH

How it was resolved

  1. The specification was rebuilt around Nylon 66 and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Gasket Set production run

Result

  • 50,000 pieces delivered inside the 8-week window.
  • Unit cost held within 3.0% of the original quotation.
  • Inspection-related rejection stayed under 2.0%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top