Case Study: Steering Rack Supply for a motorcycle assembler in Central Asia
Source:Case /
Time:2026-09-18
Steering Rack for A motorcycle assembler in Central Asia
A motorcycle assembler came to us with a steering rack programme for Central Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- A specification nobody had written down
- Premature wear on the first batch
- Documentation that arrived after the container shipped

What was specified
| Part | Steering Rack |
|---|---|
| Client | A motorcycle assembler |
| Market | Central Asia |
| Volume | 10,000 pieces across 3 specifications |
| Base material | PVC Coated Fabric |
| Sampling rounds | 3 |
| Delivery window | 6 weeks from PO to ex-factory |
| Compliance | DOT |
How it was resolved
- The specification was rebuilt around PVC Coated Fabric and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 6-week window.
- Unit cost held within 2.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.
Planning something similar?
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.



