Case Study: Parking Sensor Supply for a mining contractor in the Middle East
Source:Case /
Time:2026-09-18
Parking Sensor for A mining contractor in the Middle East
A mining contractor came to us with a parking sensor programme for the Middle East. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- A fitment that looked right on paper and failed on the bench
- Warranty claims traced back to a single lot
- A specification nobody had written down

What was specified
| Part | Parking Sensor |
|---|---|
| Client | A mining contractor |
| Market | the Middle East |
| Volume | 10,000 pieces across 3 specifications |
| Base material | Brass |
| Sampling rounds | 4 |
| Delivery window | 5 weeks from PO to ex-factory |
| Compliance | ISO 9001 |
How it was resolved
- The specification was rebuilt around Brass and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 10,000 pieces delivered inside the 5-week window.
- Unit cost held within 4.5% of the original quotation.
- Inspection-related rejection stayed under 0.5%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Approve a pre-production sample made from the actual bulk material. Substitute material behaves differently in service.
Planning something similar?
Share a sample or a drawing and we will quote against a written specification, not against a photograph.