Welcome to Auto, Motorcycle Parts & Accessories official website!

Case Study: Hub Cap Supply for a national parts importer in Southeast Asia

Source:Case / Time:2026-09-18

Hub Cap for A national parts importer in Southeast Asia

A national parts importer came to us with a hub cap programme for Southeast Asia. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.

The starting point

  • A specification nobody had written down
  • Documentation that arrived after the container shipped
  • Packing that arrived crushed at the port

Hub Cap case study

What was specified

PartHub Cap
ClientA national parts importer
MarketSoutheast Asia
Volume2,000 pieces across 4 specifications
Base materialBronze
Sampling rounds4
Delivery window10 weeks from PO to ex-factory
ComplianceDOT

How it was resolved

  1. The specification was rebuilt around Bronze and the tolerance locked before bulk.
  2. A pre-production sample was approved and kept as the golden reference.
  3. Production ran with in-line inspection and a mid-run photo report.
  4. Cartons were packed to the client's own barcode and ratio specification.
  5. Documentation shipped with the goods instead of after them.

Hub Cap production run

Result

  • 2,000 pieces delivered inside the 10-week window.
  • Unit cost held within 4.5% of the original quotation.
  • Inspection-related rejection stayed under 0.5%.
  • The specification is on file, so reorders reproduce the approved sample.

What we would repeat

Keep one accountable owner on both sides. Most delays come from hand-offs, not from machines.

Planning something similar?

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top