Case Study: AC Condenser Supply for a marine equipment dealer in East Africa
Source:Case /
Time:2026-09-18
AC Condenser for A marine equipment dealer in East Africa
A marine equipment dealer came to us with a ac condenser programme for East Africa. The brief was ordinary and unforgiving at the same time: a fixed launch window, a landed cost that had to survive freight and duty, and a part that had to match an existing sample. This case records what was specified, what went wrong in sampling and how the bulk order landed.
The starting point
- Packing that arrived crushed at the port
- A fitment that looked right on paper and failed on the bench
- Documentation that arrived after the container shipped

What was specified
| Part | AC Condenser |
|---|---|
| Client | A marine equipment dealer |
| Market | East Africa |
| Volume | 2,000 pieces across 4 specifications |
| Base material | Reinforced Nylon |
| Sampling rounds | 3 |
| Delivery window | 10 weeks from PO to ex-factory |
| Compliance | SGS |
How it was resolved
- The specification was rebuilt around Reinforced Nylon and the tolerance locked before bulk.
- A pre-production sample was approved and kept as the golden reference.
- Production ran with in-line inspection and a mid-run photo report.
- Cartons were packed to the client's own barcode and ratio specification.
- Documentation shipped with the goods instead of after them.

Result
- 2,000 pieces delivered inside the 10-week window.
- Unit cost held within 3.0% of the original quotation.
- Inspection-related rejection stayed under 2.0%.
- The specification is on file, so reorders reproduce the approved sample.
What we would repeat
Fix the specification count early. Adding variants after production starts is the most expensive change a client can request.
Planning something similar?
Share a sample or a drawing and we will quote against a written specification, not against a photograph.